Having actually formerly assured to make the 14-mile plan Britain’s greenest roadway, National Highways has today stated that the Lower Thames Crossing (LTC) will be “the very first significant facilities program in Britain to be carbon neutral in building and construction”.
It will not be obviously, which they confess.
National Highways states that the real goal is to cut the building carbon footprint by 70%, which is possible by utilizing all the most recent eco-friendly equipment and products, and after that balanced out the other 30%– investing public cash simply to strike a target.
To assist with the buzz and to reveal that they suggest service, a hydrogen-powered JCB backhoe loader has actually been sent out from its Staffordshire test-bed to website in Kent to assist Skanska with LTC pre-construction study work near Gravesend. The maker is run by Flannery Plant Hire, powered by hydrogen fuel from Ryze, a Jo Bamford endeavor.
The live release of the device follows a trial at Gallagher’s Hermitage Quarry near Maidstone previously this year. The JCB device is still going through screening and recognition however the maker wants to enter into complete production at its Rocester factory in Staffordshire at some point next year.
< figure id ="adid2571" data-href ="http://www.theconstructionindex.co.uk/redirect/campaign/12846/"> < img width ="728"height ="90"alt ="Related Information"loading ="lazy" src ="http://www.theconstructionindex.co.uk/assets/adverts/42371-1757952483-728x90.jpg">
Matt Palmer, National Highways’executive director for the Lower Thames Crossing, stated: “Our dedication to being carbon neutral and bring back nature will show that the British building market has the vision and abilities to develop the jobs required to drive development in a manner that boosts, not effects, the regional environment. It’s an extremely interesting minute as our aspirations to develop a regional labor force integrate with this innovative innovation to put UK building at the leading edge of international development.”
Steve Fox, JCB’s handling director for worldwide significant accounts, stated: “This is a substantial turning point for the building market. For the very first time on a significant facilities task, hydrogen has actually shown its worth on website as a carbon-neutral fuel in a working JCB building maker. We are really delighted about the future chances for hydrogen-powered equipment on the Lower Thames Crossing task.”
The job got preparing approval in March 2025 however the federal government is not yet prepared to put its cash where its mouth is. The Treasury is wishing for some personal financing to assist with the expense. No word yet on development there.
National Highways, nevertheless, is still wishing for a 2026 start of building and construction, for conclusion in the early 2030s.
Got a story? Email [email protected]

AI Content Analysis
This content has been analyzed for AI generation:
- AI Probability: 0%
- Confidence:
- Last Checked: October 3, 2025